Our new location Bosnia and Hercegovina will be open in 1 month.
Also for this location amazing servers and amazing prices coming for you.
All networks and system our own investments.

500 kVA total capital
30 kVA power per standard standard
Power supply via A, B and C feed

230 Volt and 400 Volt available, 48 Volt on request
PUE value <1.2 (+ - 1.12) most efficient in the Netherlands!
Green electricity via 100% BIH wind
Direct free air cooling
Temperature on data floor 15-22 ° C
Radius connection possible with uptime guarantee of 99.999%
Camera surveillance, intrusion detection system
Professional security with alarm
Access with personal access pass
Possibility for iris scan or facial recognition
Separately lockable racks
Brzinet Service Desk accessible 24/7, 365 days a year
If you want to visit us, info@brzinet.com just send us mail.


Saturday, February 2, 2019

« Назад